In November 19, 2010, 33 sets of high-altitude WT1500/D82/H65 successfully connect to the grid after batch commissioning in CSR Eryuan Wind Farm .The wind turbines operated stably, which marks the high-altitude WT1500 series wind turbine developed independently by CSR Wind Power has obtained staged achievements.
The Eryuan Wind Farm is located at Yousuo Town of Eryuan County with an AMSL of 1971 meters. There are extremely abundant wind energy resources in the mountain area, the total installed capacity of the Wind Farm is 49,500 KW, the expected electric energy production in the Wind Farm is 161.55 million KWH and annual on-grid electric quantity is more than 122.78 million KWH.
WT1500 high-altitude wind turbine has conducted a large number of optimal treatments and special designs to the wind turbine based on the batch operation of WT1650 model and combining the technical experience of rail transit products operating maturely (Qinghai-Tibet Railway) in the special environment of high altitude. This mode retains the excellent low voltage ride through function, control and electric performance in the environment of high altitude, completely meeting the requirement of power grid for the complete machine. A brand-new cooling system is designed for its protective system particularly aiming at the environment in plateau areas; meanwhile, complete load calculation and structural optimal design are conducted by combining the particular wind condition in high-altitude areas. This model is a new type wind turbine customized for high-altitude environment.